For inquiries about the Calgary Event Centre
Cementec Industries
CANA Construction
2021
Sprung Structures
Lump Sum
Industrial
To provide Canadian-owned Cementec with a new raw materials storage structure, CANA erected an 87 metre x 31 metre x 12 metre tensioned membrane structure from Sprung Structures. The tensioned membrane structure is used as a storage space for Cementec’s raw materials for concrete production.
The existing space was an empty parking lot with new asphalt that was laid down in the summer of 2020. Because we started the project in February 2021, preparation included clearing snow where the tensioned membrane structure would sit.
As we began to install the anchors into the ground, we encountered a polar vortex with temperatures hitting -30 degrees Celsius. Due to the freezing temperatures, we were unable to continue with the anchor installation. To stay on schedule, we hired a piling company to come to site and install the anchors for us, using their specialized equipment that was able to break through the frost underground.
Because Cementec remained operational during the project, comprehensive safety plans were developed and extensive signage and fencing was set up to keep project personnel and Cementec employees safe, and maintain business operations.
We are best known for our unique and one-of-a-kind projects, but these projects are just some of many institutional, commercial, industrial, residential and infrastructure work that we complete.