Supporting the front line at Peter Lougheed Hospital

April 28, 2020

CANA, along with Stantec, Sprung Structures, Engineered Air, Falkbuilt, Acutech, and Botting supported Alberta Health Services by building life saving infrastructure - quickly.

The field hospital took a little over two weeks to build - from concept to completion. Located in the parking lot of Peter Lougheed Centre, the field hospital will provide 100 additional treatment spaces should Alberta need it for treating COVID-19 cases.

Watch the video of our collaborative approach:

Share